Novoselivka: 1,118 kWh per kWp a year, tilt 37° 1° east of south (PVGIS). 0.9% above the oblast median (1,108). #193 of 285 in the rayon, #372 of 1558 in the oblast.

Pryluky, the rayon centre, is 54 km away. 164 m above sea level. 26 km away: Romny, the nearest bigger centre, 1,126 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 120 km. 12.75 m between rows, pitch 16.57 m (latitude 50.7°).

Yield of 1 kWp
1,118kWh/year
Tilt
37°1° east of south
10 kW
11,180kWh/year
Row pitch
16.57m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Novoselivka

The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Суми, 120 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan58Feb92Mar116Apr140May143Jun145Jul142Aug111Sep79Oct35Nov23Dec

July: 145 kWh/kWp, December: 23 — 6.3 times less.

November: 35 against 33 in the oblast, 6.1% more.

Novoselivka: plants, kWh
kWpA yearJulyDecember
55,590725115
1011,1801,450230
1516,7702,175345

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Prylutskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.