Solar plant: site data
Solar power plant in Vasiukiv, Prylutskyi Raion, Chernihiv Oblast
Vasiukiv: 1,097 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.0% below the oblast median (1,108). #285 of 285 in the rayon, #1070 of 1558 in the oblast.
Pryluky, the rayon centre, is 49 km away. 146 m above sea level. 31 km away: Romny, the nearest bigger centre, 1,126 — 2.6% less here. Snow and wind from the nearest regional centre in the DBN — Суми, 125 km. 12.45 m between rows, pitch 16.32 m (latitude 50.7°).
- Yield of 1 kWp
- 1,097kWh/year
- Tilt
- 36°1° east of south
- 10 kW
- 10,967kWh/year
- Row pitch
- 16.32m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,670 / 420Pa
Ground frame designer
A ground frame for a solar plant: Vasiukiv
The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Суми, 125 km: snow 1,670 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 146 kWh/kWp, December: 16 — 9.1 times less.
December: 16 against 24 in the oblast, 33.3% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,484 | 730 | 80 |
| 10 | 10,967 | 1,460 | 160 |
| 15 | 16,451 | 2,190 | 240 |
Example: a 10 kW ground frame
For the loads of Sumy: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.
How these numbers are computed
Nearby
- Stepove2 km1,111 kWh/kWp
- Antishky2 km1,111 kWh/kWp
- Skybivshchyna4 km1,118 kWh/kWp
- Myrne4 km1,112 kWh/kWp
- Novoselivka5 km1,118 kWh/kWp
- Lozove5 km1,115 kWh/kWp
All places: Prylutskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.