Solar plant: site data

Solar power plant in Mezyn, Novhorod-Siverskyi Raion, Chernihiv Oblast

Mezyn: 1,088 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.8% below the oblast median (1,108). #130 of 247 in the rayon, #1250 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 24 km away. 130 m above sea level. 24 km away: Novhorod-Siverskyi, the nearest bigger centre, the same 1,083. Snow and wind from the nearest regional centre in the DBN — Чернігів, 128 km. 14.69 m between rows, pitch 18.41 m (latitude 51.8°).

Yield of 1 kWp
1,088kWh/year
Tilt
39°2° east of south
10 kW
10,876kWh/year
Row pitch
18.41m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Mezyn

The designer opens with this place’s coordinates, latitude 51.8° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 128 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan58Feb98Mar112Apr137May139Jun138Jul135Aug107Sep72Oct32Nov24Dec

June: 139 kWh/kWp, December: 24 — 5.8 times less.

April: 112 against 117 in the oblast, 4.3% less.

Mezyn: plants, kWh
kWpA yearJuneDecember
55,438695120
1010,8761,390240
1516,3142,085360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.