Hnativka: 1,091 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.6% below the oblast median (1,108). #95 of 247 in the rayon, #1181 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 19 km away. 130 m above sea level. 19 km away: Novhorod-Siverskyi, the nearest bigger centre, 1,083 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 130 km. 14.76 m between rows, pitch 18.48 m (latitude 51.9°).

Yield of 1 kWp
1,091kWh/year
Tilt
39°2° east of south
10 kW
10,907kWh/year
Row pitch
18.48m · GCR 0.26
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Hnativka

The designer opens with this place’s coordinates, latitude 51.9° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 130 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan60Feb99Mar113Apr137May140Jun138Jul135Aug106Sep72Oct32Nov23Dec

June: 140 kWh/kWp, December: 23 — 6.1 times less.

February: 60 against 57 in the oblast, 5.3% more.

Hnativka: plants, kWh
kWpA yearJuneDecember
55,454700115
1010,9071,400230
1516,3612,100345

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.