Solar plant: site data

Solar power plant in Horodyshche, Novhorod-Siverskyi Raion, Chernihiv Oblast

Horodyshche: 1,102 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.6% below the oblast median (1,108). #43 of 247 in the rayon, #989 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 47 km away. 130 m above sea level. 45 km away: Shostka, the nearest bigger centre, 1,082 — 1.9% more here. Snow and wind from the nearest regional centre in the DBN — Чернігів, 116 km. 14.13 m between rows, pitch 17.90 m (latitude 51.6°).

Yield of 1 kWp
1,102kWh/year
Tilt
38°1° east of south
10 kW
11,017kWh/year
Row pitch
17.90m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Horodyshche

The designer opens with this place’s coordinates, latitude 51.6° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 116 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan60Feb97Mar116Apr140May141Jun140Jul137Aug108Sep73Oct33Nov24Dec

June: 141 kWh/kWp, December: 24 — 5.9 times less.

February: 60 against 57 in the oblast, 5.3% more.

Horodyshche: plants, kWh
kWpA yearJuneDecember
55,509705120
1011,0171,410240
1516,5262,115360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.