Solar plant: site data
Solar power plant in Bronyvy, Novhorod-Siverskyi Raion, Chernihiv Oblast
Bronyvy: 1,086 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 2.0% below the oblast median (1,108). #142 of 247 in the rayon, #1284 of 1558 in the oblast.
Novhorod-Siverskyi, the rayon centre, is 66 km away. 129 m above sea level. 62 km away: Koryukivka, the nearest bigger centre, the same 1,085. Snow and wind from the nearest regional centre in the DBN — Чернігів, 121 km. 15.36 m between rows, pitch 19.08 m (latitude 52.3°).
- Yield of 1 kWp
- 1,086kWh/year
- Tilt
- 39°2° east of south
- 10 kW
- 10,858kWh/year
- Row pitch
- 19.08m · GCR 0.25
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,720 / 410Pa
Ground frame designer
A ground frame for a solar plant: Bronyvy
The designer opens with this place’s coordinates, latitude 52.3° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 121 km: snow 1,720 Pa, wind 410 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 140 kWh/kWp, December: 25 — 5.6 times less.
November: 29 against 33 in the oblast, 12.1% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,429 | 700 | 125 |
| 10 | 10,858 | 1,400 | 250 |
| 15 | 16,287 | 2,100 | 375 |
Example: a 10 kW ground frame
For the loads of Chernihiv: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Tymonovychi2 km1,082 kWh/kWp
- Medvedivka3 km1,087 kWh/kWp
- Zarichchia4 km1,081 kWh/kWp
- Lubiane4 km1,087 kWh/kWp
- Kalynivske6 km1,081 kWh/kWp
- Pokrovske6 km1,084 kWh/kWp
All places: Novhorod-Siverskyi RaionChernihiv Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.