Solar plant: site data

Solar power plant in Medvedivka, Novhorod-Siverskyi Raion, Chernihiv Oblast

Medvedivka: 1,087 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.9% below the oblast median (1,108). #132 of 247 in the rayon, #1254 of 1558 in the oblast.

Novhorod-Siverskyi, the rayon centre, is 63 km away. 142 m above sea level. 59 km away: Koryukivka, the nearest bigger centre, the same 1,085. Snow and wind from the nearest regional centre in the DBN — Чернігів, 120 km. 15.33 m between rows, pitch 19.05 m (latitude 52.3°).

Yield of 1 kWp
1,087kWh/year
Tilt
39°2° east of south
10 kW
10,872kWh/year
Row pitch
19.05m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,720 / 410Pa

Ground frame designer

A ground frame for a solar plant: Medvedivka

The designer opens with this place’s coordinates, latitude 52.3° for the row spacing and the DBN loads of the nearest regional centre — Чернігів, 120 km: snow 1,720 Pa, wind 410 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan62Feb99Mar114Apr138May140Jun136Jul133Aug105Sep70Oct29Nov24Dec

June: 140 kWh/kWp, December: 24 — 5.8 times less.

November: 29 against 33 in the oblast, 12.1% less.

Medvedivka: plants, kWh
kWpA yearJuneDecember
55,436700120
1010,8721,400240
1516,3082,100360

Snow and wind: Чернігів

Example: a 10 kW ground frame

For the loads of Chernihiv: 11.16 kWp, 18 panels, 363 kg of steel, 12 piles, materials ≈ 54,473 UAH.

The whole frame: drawing, BOM, checks