Solar plant: site data

Solar power plant in Yablunivka, Zvenyhorodskyi Raion, Cherkasy Oblast

Yablunivka: 1,135 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 0.8% below the oblast median (1,144). #186 of 197 in the rayon, #608 of 731 in the oblast.

Shpola, the rayon centre, is 55 km away. 202 m above sea level. 13 km away: Lysyanka, the nearest bigger centre, 1,148 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 104 km. 11.10 m between rows, pitch 14.97 m (latitude 49.2°).

Yield of 1 kWp
1,135kWh/year
Tilt
36°3° east of south
10 kW
11,345kWh/year
Row pitch
14.97m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Yablunivka

The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 104 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan52Feb90Mar117Apr139May142Jun147Jul144Aug117Sep87Oct39Nov26Dec

July: 147 kWh/kWp, December: 26 — 5.7 times less.

December: 26 against 28 in the oblast, 7.1% less.

Yablunivka: plants, kWh
kWpA yearJulyDecember
55,673735130
1011,3451,470260
1517,0182,205390

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zvenyhorodskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.