Solar plant: site data

Solar power plant in Velyki Kanivtsi, Zolotoniskyi Raion, Cherkasy Oblast

Velyki Kanivtsi: 1,160 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.4% above the oblast median (1,144). #39 of 160 in the rayon, #74 of 731 in the oblast.

Zolotonosha, the rayon centre, is 23 km away. 106 m above sea level. 23 km away: Zolotonosha, the nearest bigger centre, the same 1,156. Snow and wind from the nearest regional centre in the DBN — Черкаси, 28 km. 11.73 m between rows, pitch 15.55 m (latitude 49.6°).

Yield of 1 kWp
1,160kWh/year
Tilt
37°2° east of south
10 kW
11,599kWh/year
Row pitch
15.55m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Velyki Kanivtsi

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 28 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan58Feb92Mar122Apr143May146Jun149Jul146Aug117Sep86Oct38Nov26Dec

July: 149 kWh/kWp, December: 26 — 5.7 times less.

December: 26 against 28 in the oblast, 7.1% less.

Velyki Kanivtsi: plants, kWh
kWpA yearJulyDecember
55,800745130
1011,5991,490260
1517,3992,235390

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zolotoniskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.