Solar plant: site data

Solar power plant in Stebne, Zvenyhorodskyi Raion, Cherkasy Oblast

Stebne: 1,143 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). Exactly the oblast median (1,144). #77 of 197 in the rayon, #382 of 731 in the oblast.

Shpola, the rayon centre, is 31 km away. 136 m above sea level. 7 km away: Zvenyhorodka, the nearest bigger centre, the same 1,145. Snow and wind from the nearest regional centre in the DBN — Черкаси, 92 km. 10.97 m between rows, pitch 14.84 m (latitude 49.0°).

Yield of 1 kWp
1,143kWh/year
Tilt
36°4° east of south
10 kW
11,434kWh/year
Row pitch
14.84m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Stebne

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 92 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan55Feb93Mar118Apr139May142Jun147Jul143Aug116Sep87Oct39Nov27Dec

July: 147 kWh/kWp, December: 27 — 5.4 times less.

December: 27 against 28 in the oblast, 3.6% less.

Stebne: plants, kWh
kWpA yearJulyDecember
55,717735135
1011,4341,470270
1517,1512,205405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 346 kg of steel, 12 piles, materials ≈ 51,820 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zvenyhorodskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.