Solar plant: site data

Solar power plant in Staryi Mokhnach, Zolotoniskyi Raion, Cherkasy Oblast

Staryi Mokhnach: 1,166 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.9% above the oblast median (1,144). #25 of 160 in the rayon, #56 of 731 in the oblast.

Zolotonosha, the rayon centre, is 48 km away. 81 m above sea level. 46 km away: Lubny, the nearest bigger centre, 1,146 — 1.7% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 52 km. 11.76 m between rows, pitch 15.58 m (latitude 49.6°).

Yield of 1 kWp
1,166kWh/year
Tilt
37°2° east of south
10 kW
11,656kWh/year
Row pitch
15.58m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Staryi Mokhnach

The designer opens with this place’s coordinates, latitude 49.6° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 52 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan60Feb98Mar121Apr142May145Jun148Jul146Aug118Sep86Oct40Nov27Dec

July: 148 kWh/kWp, December: 27 — 5.5 times less.

February: 60 against 55 in the oblast, 9.1% more.

Staryi Mokhnach: plants, kWh
kWpA yearJulyDecember
55,828740135
1011,6561,480270
1517,4842,220405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zolotoniskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.