Solar plant: site data
Solar power plant in Rubanyi Mist, Zvenyhorodskyi Raion, Cherkasy Oblast
Rubanyi Mist: 1,128 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.4% below the oblast median (1,144). #197 of 197 in the rayon, #696 of 731 in the oblast.
Shpola, the rayon centre, is 66 km away. 221 m above sea level. 25 km away: Lysyanka, the nearest bigger centre, 1,148 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 116 km. 11.08 m between rows, pitch 14.95 m (latitude 49.2°).
- Yield of 1 kWp
- 1,128kWh/year
- Tilt
- 36°3° east of south
- 10 kW
- 11,276kWh/year
- Row pitch
- 14.95m · GCR 0.32
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,520 / 420Pa
Ground frame designer
A ground frame for a solar plant: Rubanyi Mist
The designer opens with this place’s coordinates, latitude 49.2° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 116 km: snow 1,520 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 147 kWh/kWp, December: 27 — 5.4 times less.
February: 49 against 55 in the oblast, 10.9% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,638 | 735 | 135 |
| 10 | 11,276 | 1,470 | 270 |
| 15 | 16,914 | 2,205 | 405 |
Example: a 10 kW ground frame
For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Shubyni Stavy7 km1,134 kWh/kWp
- Rusalivka7 km1,129 kWh/kWp
- Kyslyn8 km1,124 kWh/kWp
- Ryzyne8 km1,136 kWh/kWp
- Kuchkivka8 km1,134 kWh/kWp
- Tovsti Rohy8 km1,137 kWh/kWp
All places: Zvenyhorodskyi RaionCherkasy Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.