Solar power plant in Papuzhyntsi, Zvenyhorodskyi Raion, Cherkasy Oblast

Papuzhyntsi: 1,136 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 0.7% below the oblast median (1,144). #179 of 197 in the rayon, #588 of 731 in the oblast.

Shpola, the rayon centre, is 60 km away. 164 m above sea level. 13 km away: Talne, the nearest bigger centre, the same 1,142. Snow and wind from the nearest regional centre in the DBN — Черкаси, 120 km. 10.93 m between rows, pitch 14.80 m (latitude 49.0°).

Yield of 1 kWp
1,136kWh/year
Tilt
36°4° east of south
10 kW
11,359kWh/year
Row pitch
14.80m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Papuzhyntsi

The designer opens with this place’s coordinates, latitude 49.0° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 120 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan53Feb90Mar117Apr139May142Jun148Jul144Aug116Sep88Oct39Nov27Dec

July: 148 kWh/kWp, December: 27 — 5.5 times less.

January: 33 against 35 in the oblast, 5.7% less.

Papuzhyntsi: plants, kWh
kWpA yearJulyDecember
55,680740135
1011,3591,480270
1517,0392,220405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed