Solar plant: site data

Solar power plant in Nova Hreblia, Umanskyi Raion, Cherkasy Oblast

Nova Hreblia: 1,128 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). 1.4% below the oblast median (1,144). #159 of 167 in the rayon, #698 of 731 in the oblast.

Uman, the rayon centre, is 46 km away. 185 m above sea level. 35 km away: Lysyanka, the nearest bigger centre, 1,148 — 1.8% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 126 km. 11.07 m between rows, pitch 14.94 m (latitude 49.1°).

Yield of 1 kWp
1,128kWh/year
Tilt
36°3° east of south
10 kW
11,275kWh/year
Row pitch
14.94m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Nova Hreblia

The designer opens with this place’s coordinates, latitude 49.1° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 126 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

32Jan50Feb88Mar118Apr138May142Jun147Jul143Aug116Sep86Oct38Nov28Dec

July: 147 kWh/kWp, December: 28 — 5.3 times less.

February: 50 against 55 in the oblast, 9.1% less.

Nova Hreblia: plants, kWh
kWpA yearJulyDecember
55,638735140
1011,2751,470280
1516,9132,205420

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Umanskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.