Solar plant: site data

Solar power plant in Myrne, Zolotoniskyi Raion, Cherkasy Oblast

Myrne: 1,172 kWh per kWp a year, tilt 37° facing south (PVGIS). 2.5% above the oblast median (1,144). #12 of 160 in the rayon, #20 of 731 in the oblast.

Zolotonosha, the rayon centre, is 39 km away. 115 m above sea level. 34 km away: Cherkasy, the nearest bigger centre, 1,138 — 3.0% more here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 34 km. 11.65 m between rows, pitch 15.47 m (latitude 49.5°).

Yield of 1 kWp
1,172kWh/year
Tilt
37°facing south
10 kW
11,722kWh/year
Row pitch
15.47m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Myrne

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 34 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan57Feb95Mar124Apr145May147Jun151Jul147Aug119Sep88Oct39Nov26Dec

July: 151 kWh/kWp, December: 26 — 5.8 times less.

December: 26 against 28 in the oblast, 7.1% less.

Myrne: plants, kWh
kWpA yearJulyDecember
55,861755130
1011,7221,510260
1517,5832,265390

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zolotoniskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.