Solar plant: site data

Solar power plant in Helmiaziv, Zolotoniskyi Raion, Cherkasy Oblast

Helmiaziv: 1,152 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.7% above the oblast median (1,144). #63 of 160 in the rayon, #158 of 731 in the oblast.

Zolotonosha, the rayon centre, is 22 km away. 98 m above sea level. 22 km away: Zolotonosha, the nearest bigger centre, the same 1,156. Snow and wind from the nearest regional centre in the DBN — Черкаси, 45 km. 11.92 m between rows, pitch 15.74 m (latitude 49.8°).

Yield of 1 kWp
1,152kWh/year
Tilt
37°2° east of south
10 kW
11,515kWh/year
Row pitch
15.74m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Helmiaziv

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 45 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan60Feb98Mar119Apr140May143Jun146Jul144Aug115Sep85Oct38Nov27Dec

July: 146 kWh/kWp, December: 27 — 5.4 times less.

February: 60 against 55 in the oblast, 9.1% more.

Helmiaziv: plants, kWh
kWpA yearJulyDecember
55,758730135
1011,5151,460270
1517,2732,190405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zolotoniskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources