Fire-rated cable penetration

The seal where a PV cable passes through a fire-rated wall or floor; its rating must be no lower than that of the construction.

Ground frame designer

Design the ground frame for your solar plant

Solispec picks the profiles and posts, checks the frame against snow and wind to the DBN and prices it down to the last bolt.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Definition

The cable from the panels to the inverter often passes through an attic floor or a wall. If that construction has a required fire resistance, the hole around the cable must not become a path for fire and smoke. DBN V.1.1-7:2016 (cl. 6.20) requires the penetration’s EI rating to be no lower than that of the construction itself.

DBN V.2.5-23:2025 (cl. 7.62) adds for wiring: EI or E rated penetrations tested to the relevant standard, and no cables in sleeves or trunking of combustible materials at such points. Clauses 7.53 and 7.54 of the same DBN forbid risers inside stairwells and open cable runs through stairwells. For PV on an apartment block this means the DC or AC route cannot run through a stairwell.

In practice the penetration is made with a certified system (collar, foam or mastic with a test report), not with ordinary expanding foam. For a house with a timber floor, also think about a combustible roof and where the cable exits onto the roof.

When this applies to a house. Floors and walls of a private house do not always have a required fire resistance, and then the cl. 6.20 penetration rules formally do not apply. But a boiler room, a garage or a fire wall between parts of the house are usually rated. Find the construction's rating in the building design. For PV on an apartment or public building, the cable route should appear in the design with the type of each penetration. Remember the combustible roof too, and the DC cable, which stays live even when the inverter is switched off.

How Solispec applies it

The Solispec constructor has a "route passes through fire-rated constructions" flag. When it is on, the report adds the requirement: EI (E) penetrations no lower than the construction’s rating, not in combustible sleeves or trunking (DBN V.1.1-7:2016 cl. 6.20; DBN V.2.5-23:2025 cl. 7.62), and reminds you not to route through stairwells (cl. 7.53, 7.54).

Solispec constructor

Norms and clauses

Related terms

The whole glossary

Solispec’s calculation is preliminary: for a design it has to be checked by an engineer. The values and clauses follow the current editions of the norms on the date of the page.