Operating conditions factor Ce

The snow load factor for clearing and melting; without data on how the roof is operated C_e = 1 (cl. 8.9).

Ground frame designer

Design the ground frame for your solar plant

Solispec picks the profiles and posts, checks the frame against snow and wind to the DBN and prices it down to the last bolt.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Definition

Ce is part of the factor C = μ · Ce · Calt in formula (8.4) of DBN V.1.2-2:2006. Under clause 8.9 it accounts for how operation affects snow build-up on a roof — clearing, melting and so on — and is set by the design brief.

The norm names one specific reduction: uninsulated roofs of workshops with high heat release, a slope over 3 % and proper meltwater drainage take Ce = 0.8. Without data on how the roof is operated, Ce may be taken as one.

Can C_e be reduced for panels?

Snow often slides off module glass, and owners sometimes clear the array by hand. But no clause of the DBN ties that to a number, and clearing cannot be guaranteed over the whole service life. For a solar plant it is sensible to keep Ce = 1 and let the tilt reduce the snow through the shape coefficient μ.

Example for Kyiv at 30°: Sm = 1.00 · 1,550 · 0.857 · 1 · 1 = 1,329 Pa. Taking Ce = 0.8 without grounds would give 1,063 Pa — 20 % less, and the rails or trusses could fall short in exactly the snowy winter.

How Solispec applies it

The Solispec engine always takes Ce = 1, as clause 8.9 allows when no operating data exist. There is no input for Ce; if a design brief sets another value, that is for the engineer checking the calculation.