Section of the table from the Solispec engine (median zone — Cherkasy)

Luxor

Ground frame for 30 Luxor Eco Line Classic LX-590M/182-144+ GG (bifacial) panels (2×15)

2 rows of 15 panels, 17.70 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
17.70kW
Steel
565.3kg
Posts
18
Bolts
196
Materials
71,949₴
Yield
20,156kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Luxor Eco Line Classic LX-590M/182-144+ GG (bifacial) panel and the 2 × 15 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames9 frames, pitch up to 2,100 mm9 frames, pitch up to 2,100 mm10 frames, pitch up to 1,870 mm
Posts181820
Footings (bored concrete)18 pcs, Ø400 mm, depth 1,100 mm18 pcs, Ø350 mm, depth 1,300 mm20 pcs, Ø300 mm, depth 1,300 mm
Concrete2.74 m³2.48 m³2.02 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,211 mm600 / 2,211 mm600 / 2,211 mm
Panel field size17,430 × 2,971 mm17,430 × 2,971 mm17,430 × 2,971 mm
Row spacing between tables (no shade on 21 December)10,270 mm at noon · 11,550 mm ±2 h11,380 mm at noon · 13,150 mm ±2 h12,480 mm at noon · 14,830 mm ±2 h
Steel518.5 kg565.3 kg603.0 kg
BoltsM10 — 132, M8 — 64M10 — 132, M8 — 64M10 — 142, M8 — 64
Panel clampsend 8, middle 56end 8, middle 56end 8, middle 56
Materials70,014 UAH71,949 UAH74,887 UAH
With installation and delivery115,204 UAH117,614 UAH120,547 UAH
Per 1 kW6,509 UAH/kW6,645 UAH/kW6,811 UAH/kW
Yield1,266 kWh/kW · 22,416 kWh/year1,139 kWh/kW · 20,156 kWh/year1,043 kWh/kW · 18,463 kWh/year
Strength σ/fy69%95%80%
Deflection / (L/200)57%78%59%
Rafter strength90%80%77%
Post utilisation18%24%23%
Utilisation98%86%89%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 180, cantilever 789 mm → strength 90%.Cherkasy: Rafter Tube 60×60×2: span between posts 2 180, cantilever 789 mm → strength 80%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 13.1 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø350 × 1 300: 0.125 m³ of concrete per post. Wind uplift on the front post ≈ 11.5 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 86%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.0 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 89%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 100 mm, 9 frames. Purlin C-channel 60×40×2: strength 95%, deflection 78% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 870 mm, 10 frames. Purlin C-channel 60×40×2: strength 80%, deflection 59% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,4479
П2Rear postTube 60×60×23,5369
Кр1Rafter (inclined beam)Tube 60×60×23,7589
Пк1Frame strutC-channel 60×40×21,7529
Х1Longitudinal brace (cross)C-channel 60×40×22,6374
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×25,4302
Р6Purlin (rail)C-channel 60×40×25,4302
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——115
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——17
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——56
—Bolt M8×50 + channel nut——64
—Concrete for 18 posts, Ø350×1300——2.48 m³

Profile cutting

35 bars of 6,000 mm, 183.7 m of profile in total.

  • Tube 60×60×218 bars
  • C-channel 60×40×217 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
71,949₴
With installation and delivery
117,614₴
Per 1 kW
6,645UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm18 bar21022,680
C-channel 60×40×2, stock length 6 000 mm17 bar23023,460
C-channel connector (splice plate L 300)8 pcs90720
Bolt M10×140 cl. 8.8 set — frame, struts45 pcs22990
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors84 pcs221,848
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts17 pcs27459
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)56 pcs321,792
Bolt M8×50 A2 + spring channel nut M871 pcs14994
Post base anchor pin (M10 / rebar Ø12)18 pcs20360
Borehole casing (roofing felt / PVC, 300 mm)18 pcs601,080
Crushed stone 20–40 for the bottom of the boreholes0.17 m³900153
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow41 m351,435
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts2.48 m³3,8009,424
Rebar Ø10 (4 bars per post)108 m283,024
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 9 × 70 mm, 4 × 30 mm, 9 × 10 mm26 pcs00
Materials71,949

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 20,156 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×15 layout with other panels

Next