Section of the table from the Solispec engine (median zone — Cherkasy)

Jinko

Ground frame for 40 Jinko Tiger Neo JKM640N-78HL4-BDV panels (2×20)

2 rows of 20 panels, 25.60 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
25.60kW
Steel
790.6kg
Posts
26
Bolts
272
Materials
101,323₴
Yield
29,153kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Jinko Tiger Neo JKM640N-78HL4-BDV panel and the 2 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames13 frames, pitch up to 1,890 mm13 frames, pitch up to 1,890 mm13 frames, pitch up to 1,890 mm
Posts262626
Footings (bored concrete)26 pcs, Ø400 mm, depth 1,100 mm26 pcs, Ø400 mm, depth 1,100 mm26 pcs, Ø300 mm, depth 1,300 mm
Concrete3.95 m³3.95 m³2.63 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,347 mm600 / 2,347 mm600 / 2,347 mm
Panel field size23,200 × 3,206 mm23,200 × 3,206 mm23,200 × 3,206 mm
Row spacing between tables (no shade on 21 December)11,110 mm at noon · 12,490 mm ±2 h12,310 mm at noon · 14,210 mm ±2 h13,490 mm at noon · 16,030 mm ±2 h
Steel738.0 kg790.6 kg809.3 kg
BoltsM10 — 188, M8 — 84M10 — 188, M8 — 84M10 — 188, M8 — 84
Panel clampsend 8, middle 76end 8, middle 76end 8, middle 76
Materials96,663 UAH101,323 UAH105,552 UAH
With installation and delivery161,400 UAH166,740 UAH170,969 UAH
Per 1 kW6,305 UAH/kW6,513 UAH/kW6,678 UAH/kW
Yield1,266 kWh/kW · 32,421 kWh/year1,139 kWh/kW · 29,153 kWh/year1,043 kWh/kW · 26,704 kWh/year
Strength σ/fy61%83%89%
Deflection / (L/200)46%62%66%
Rafter strength95%84%91%
Post utilisation19%25%27%
Utilisation98%86%100%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 349, cantilever 851 mm → strength 95%.Cherkasy: Rafter Tube 60×60×2: span between posts 2 349, cantilever 851 mm → strength 84%.Chernihiv: Rafter Tube 60×60×2: span between posts 2 349, cantilever 851 mm → strength 91%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 13.1 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.4 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 86%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 11.2 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 100%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 1 890 mm, 13 frames. Purlin C-channel 60×40×2: strength 83%, deflection 62% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 890 mm, 13 frames. Purlin C-channel 60×40×2: strength 89%, deflection 66% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,29713
П2Rear postTube 60×60×23,47213
Кр1Rafter (inclined beam)Tube 60×60×24,05013
Пк1Frame strutC-channel 60×40×21,87013
Х1Longitudinal brace (cross)C-channel 60×40×22,5574
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×26,0002
Р6Purlin (rail)C-channel 60×40×26,0002
Р7Purlin (rail)C-channel 60×40×25,2002
Р8Purlin (rail)C-channel 60×40×25,2002
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——167
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——21
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——76
—Bolt M8×50 + channel nut——84
—Concrete for 26 posts, Ø400×1100——3.95 m³

Profile cutting

49 bars of 6,000 mm, 255.0 m of profile in total.

  • Tube 60×60×226 bars
  • C-channel 60×40×223 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
101,323₴
With installation and delivery
166,740₴
Per 1 kW
6,513UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm26 bar21032,760
C-channel 60×40×2, stock length 6 000 mm23 bar23031,740
C-channel connector (splice plate L 300)12 pcs901,080
Bolt M10×140 cl. 8.8 set — frame, struts65 pcs221,430
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors121 pcs222,662
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts21 pcs27567
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)76 pcs322,432
Bolt M8×50 A2 + spring channel nut M893 pcs141,302
Post base anchor pin (M10 / rebar Ø12)26 pcs20520
Borehole casing (roofing felt / PVC, 300 mm)26 pcs601,560
Crushed stone 20–40 for the bottom of the boreholes0.33 m³900297
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow55 m351,925
Module earthing clip (under the clamp)40 pcs20800
Cable clip, stainless120 pcs5600
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts3.95 m³3,80015,010
Rebar Ø10 (4 bars per post)136 m283,808
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 13 × 70 mm, 4 × 30 mm, 13 × 10 mm34 pcs00
Materials101,323

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 29,153 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×20 layout with other panels

Next