Section of the table from the Solispec engine (median zone — Cherkasy)

Huasun

Ground frame for 12 Huasun Himalaya G12 HS-210-B132DS720 (HJT) panels (2×6)

2 rows of 6 panels, 8.64 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
8.64kW
Steel
306.6kg
Posts
10
Bolts
104
Materials
38,861₴
Yield
9,839kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Huasun Himalaya G12 HS-210-B132DS720 (HJT) panel and the 2 × 6 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames5 frames, pitch up to 1,870 mm5 frames, pitch up to 1,870 mm5 frames, pitch up to 1,870 mm
Posts101010
Footings (bored concrete)10 pcs, Ø400 mm, depth 1,100 mm10 pcs, Ø350 mm, depth 1,100 mm10 pcs, Ø300 mm, depth 1,300 mm
Concrete1.52 m³1.16 m³1.01 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,289 mm600 / 2,289 mm600 / 2,289 mm
Panel field size8,058 × 3,105 mm8,058 × 3,105 mm8,058 × 3,105 mm
Row spacing between tables (no shade on 21 December)10,740 mm at noon · 12,080 mm ±2 h11,900 mm at noon · 13,750 mm ±2 h13,050 mm at noon · 15,510 mm ±2 h
Steel287.0 kg306.6 kg313.8 kg
BoltsM10 — 76, M8 — 28M10 — 76, M8 — 28M10 — 76, M8 — 28
Panel clampsend 8, middle 20end 8, middle 20end 8, middle 20
Materials39,741 UAH38,861 UAH42,268 UAH
With installation and delivery62,511 UAH61,896 UAH65,303 UAH
Per 1 kW7,235 UAH/kW7,164 UAH/kW7,558 UAH/kW
Yield1,266 kWh/kW · 10,942 kWh/year1,139 kWh/kW · 9,839 kWh/year1,043 kWh/kW · 9,013 kWh/year
Strength σ/fy58%79%84%
Deflection / (L/200)43%58%62%
Rafter strength88%78%84%
Post utilisation17%23%25%
Utilisation93%95%95%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 278, cantilever 825 mm → strength 88%.Chernihiv: Rafter Tube 60×60×2: span between posts 2 278, cantilever 825 mm → strength 84%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 12.4 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 93%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.8 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 95%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.6 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 95%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 1 870 mm, 5 frames. Purlin C-channel 60×40×2: strength 84%, deflection 62% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2745
П2Rear postTube 60×60×23,4145
Кр1Rafter (inclined beam)Tube 60×60×23,9285
Пк1Frame strutC-channel 60×40×21,8205
Х1Longitudinal brace (cross)C-channel 60×40×22,5044
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×22,0582
Р4Purlin (rail)C-channel 60×40×22,0582
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——63
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——13
—End clamp 35 mm——8
—Mid clamp (30–40 mm)——20
—Bolt M8×55 + channel nut——28
—Concrete for 10 posts, Ø350×1100——1.16 m³

Profile cutting

19 bars of 6,000 mm, 99.4 m of profile in total.

  • Tube 60×60×210 bars
  • C-channel 60×40×29 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
38,861₴
With installation and delivery
61,896₴
Per 1 kW
7,164UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm10 bar21012,600
C-channel 60×40×2, stock length 6 000 mm9 bar23012,420
C-channel connector (splice plate L 300)4 pcs90360
Bolt M10×140 cl. 8.8 set — frame, struts25 pcs22550
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors46 pcs221,012
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts13 pcs27351
End clamp 35 mm8 pcs35280
Mid clamp (30–40 mm)20 pcs32640
Bolt M8×55 A2 + spring channel nut M831 pcs14434
Post base anchor pin (M10 / rebar Ø12)10 pcs20200
Borehole casing (roofing felt / PVC, 300 mm)10 pcs60600
Crushed stone 20–40 for the bottom of the boreholes0.10 m³90090
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow24 m35840
Module earthing clip (under the clamp)12 pcs20240
Cable clip, stainless36 pcs5180
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.16 m³3,8004,408
Rebar Ø10 (4 bars per post)52 m281,456
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 5 × 70 mm, 4 × 30 mm, 5 × 10 mm18 pcs00
Materials38,861

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 9,839 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×6 layout with other panels