Section of the table from the Solispec engine (median zone — Cherkasy)

DAS Solar

Ground frame for 30 DAS Solar D-Mini DAS-DH108NA-440 panels (3×10)

3 rows of 10 panels, 13.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
13.20kW
Steel
567.7kg
Posts
16
Bolts
212
Materials
72,097₴
Yield
15,032kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the DAS Solar D-Mini DAS-DH108NA-440 panel and the 3 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 80×40×2C-channel 80×40×2C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 60×40×2
Frames8 frames, pitch up to 1,600 mm8 frames, pitch up to 1,600 mm6 frames, pitch up to 2,200 mm
Posts161612
Footings (bored concrete)16 pcs, Ø400 mm, depth 1,100 mm16 pcs, Ø350 mm, depth 1,100 mm12 pcs, Ø350 mm, depth 1,500 mm
Concrete2.43 m³1.86 m³1.91 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,505 mm600 / 2,505 mm600 / 2,480 mm
Panel field size11,660 × 3,462 mm11,660 × 3,462 mm11,660 × 3,476 mm
Row spacing between tables (no shade on 21 December)11,680 mm at noon · 13,130 mm ±2 h12,940 mm at noon · 14,950 mm ±2 h14,190 mm at noon · 16,860 mm ±2 h
Steel567.7 kg567.7 kg536.6 kg
BoltsM10 — 146, M8 — 66M10 — 146, M8 — 66M10 — 118, M8 — 66
Panel clampsend 12, middle 54end 12, middle 54end 12, middle 54
Materials74,308 UAH72,097 UAH73,149 UAH
With installation and delivery108,185 UAH105,974 UAH107,159 UAH
Per 1 kW8,196 UAH/kW8,028 UAH/kW8,118 UAH/kW
Yield1,266 kWh/kW · 16,717 kWh/year1,139 kWh/kW · 15,032 kWh/year1,043 kWh/kW · 13,769 kWh/year
Strength σ/fy56%75%85%
Deflection / (L/200)44%59%73%
Rafter strength72%98%74%
Post utilisation18%24%36%
Utilisation88%91%89%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.8 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 88%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.3 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 91%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 13.8 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 89%.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 80×40×2: span between posts 2 695, cantilever 976 mm → strength 98%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Chernihiv: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 85%, deflection 73% of L/200 (snow on panel 1 106 Pa).

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2838
П2Rear postTube 60×60×23,6308
Кр1Rafter (inclined beam)C-channel 80×40×24,6468
Пк1Frame strutC-channel 41×41×2.52,0158
Пк2Front frame strutC-channel 41×41×2.52,6478
Х1Longitudinal brace (cross)C-channel 41×41×2.52,4624
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.55,6603
Р4Purlin (rail)C-channel 41×41×2.55,6603
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——32
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——8
—Bolt M10×100 set · purlin to rafter——48
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——40
—Bolt M10×140 set · strut to rafter — through spacer inserts——8
—Bolt M10×160 set · brace to post — through spacer inserts——4
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——54
—Bolt M8×50 + channel nut——66
—Concrete for 16 posts, Ø350×1100——1.86 m³

Profile cutting

38 bars of 6,000 mm, 201.6 m of profile in total.

  • Tube 60×60×28 bars
  • C-channel 80×40×28 bars
  • C-channel 41×41×2.522 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
72,097₴
With installation and delivery
105,974₴
Per 1 kW
8,028UAH/kW

The engine's estimate has 27 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 15,032 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 3×10 layout with other panels

Next