Section of the table from the Solispec engine (median zone — Cherkasy)

Canadian Solar

Ground frame for 16 Canadian Solar TOPBiHiKu6 CS6.3-66TB-655 (TOPCon Gen3) panels (2×8)

2 rows of 8 panels, 10.48 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
10.48kW
Steel
358.4kg
Posts
12
Bolts
122
Materials
45,033₴
Yield
11,934kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Canadian Solar TOPBiHiKu6 CS6.3-66TB-655 (TOPCon Gen3) panel and the 2 × 8 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 1,760 mm6 frames, pitch up to 1,760 mm6 frames, pitch up to 1,760 mm
Posts121212
Footings (bored concrete)12 pcs, Ø400 mm, depth 1,100 mm12 pcs, Ø350 mm, depth 1,100 mm12 pcs, Ø300 mm, depth 1,300 mm
Concrete1.83 m³1.40 m³1.21 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,287 mm600 / 2,287 mm600 / 2,287 mm
Panel field size9,352 × 3,102 mm9,352 × 3,102 mm9,352 × 3,102 mm
Row spacing between tables (no shade on 21 December)10,730 mm at noon · 12,070 mm ±2 h11,890 mm at noon · 13,740 mm ±2 h13,040 mm at noon · 15,490 mm ±2 h
Steel334.8 kg358.4 kg367.0 kg
BoltsM10 — 86, M8 — 36M10 — 86, M8 — 36M10 — 86, M8 — 36
Panel clampsend 8, middle 28end 8, middle 28end 8, middle 28
Materials44,931 UAH45,033 UAH48,307 UAH
With installation and delivery72,268 UAH72,685 UAH75,959 UAH
Per 1 kW6,896 UAH/kW6,936 UAH/kW7,248 UAH/kW
Yield1,266 kWh/kW · 13,272 kWh/year1,139 kWh/kW · 11,934 kWh/year1,043 kWh/kW · 10,932 kWh/year
Strength σ/fy51%70%75%
Deflection / (L/200)36%48%52%
Rafter strength83%74%79%
Post utilisation16%22%24%
Utilisation87%90%89%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 83%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.6 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 87%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.2 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 90%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.9 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 89%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2746
П2Rear postTube 60×60×23,4126
Кр1Rafter (inclined beam)Tube 60×60×23,9246
Пк1Frame strutC-channel 60×40×21,8186
Х1Longitudinal brace (cross)C-channel 60×40×22,4204
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×23,3522
Р4Purlin (rail)C-channel 60×40×23,3522
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——72
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——14
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——28
—Bolt M8×50 + channel nut——36
—Concrete for 12 posts, Ø350×1100——1.40 m³

Profile cutting

22 bars of 6,000 mm, 115.7 m of profile in total.

  • Tube 60×60×212 bars
  • C-channel 60×40×210 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
45,033₴
With installation and delivery
72,685₴
Per 1 kW
6,936UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm12 bar21015,120
C-channel 60×40×2, stock length 6 000 mm10 bar23013,800
C-channel connector (splice plate L 300)4 pcs90360
Bolt M10×140 cl. 8.8 set — frame, struts30 pcs22660
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors51 pcs221,122
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts14 pcs27378
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)28 pcs32896
Bolt M8×50 A2 + spring channel nut M840 pcs14560
Post base anchor pin (M10 / rebar Ø12)12 pcs20240
Borehole casing (roofing felt / PVC, 300 mm)12 pcs60720
Crushed stone 20–40 for the bottom of the boreholes0.12 m³900108
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow27 m35945
Module earthing clip (under the clamp)16 pcs20320
Cable clip, stainless48 pcs5240
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.40 m³3,8005,320
Rebar Ø10 (4 bars per post)63 m281,764
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 6 × 70 mm, 4 × 30 mm, 6 × 10 mm20 pcs00
Materials45,033

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 11,934 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel