Ground frame for 10 Astronergy ASTRO N8 CHSM66N(DG)/F-BH-720 panels (1×10)
1 row of 10 panels, 7.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.
- Power
- 7.20kW
- Steel
- 262.6kg
- Posts
- 14
- Bolts
- 104
- Materials
- 37,402₴
- Yield
- 8,199kWh/year
Figures for the median zone (Cherkasy); all three zones are in the table below.
Ground frame designer
Open this frame in the builder
The builder opens with the Astronergy ASTRO N8 CHSM66N(DG)/F-BH-720 panel and the 1 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.
- No sign-up
- Snow and wind check
- Drawings and estimate
Three snow and wind zones
The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.
| Parameter | Low loadKherson · S₀ 760 · W₀ 480 | Median loadCherkasy · S₀ 1,520 · W₀ 420 | High loadChernihiv · S₀ 1,720 · W₀ 410 |
|---|---|---|---|
| Posts | Tube 60×60×2 | Tube 60×60×2 | Tube 60×60×2 |
| Rafters | Tube 60×60×2 | Tube 60×60×2 | Tube 60×60×2 |
| Purlins and braces | C-channel 60×40×2 | C-channel 60×40×2 | C-channel 60×40×2 |
| Frames | 6 frames, pitch up to 2,520 mm | 7 frames, pitch up to 2,120 mm | 8 frames, pitch up to 1,830 mm |
| Posts | 12 | 14 | 16 |
| Footings (bored concrete) | 12 pcs, Ø300 mm, depth 900 mm | 14 pcs, Ø300 mm, depth 1,100 mm | 16 pcs, Ø300 mm, depth 1,300 mm |
| Concrete | 0.84 m³ | 1.20 m³ | 1.62 m³ |
| Tilt | 30° | 30° | 30° |
| Panel bottom / post top | 600 / 1,339 mm | 600 / 1,339 mm | 600 / 1,339 mm |
| Panel field size | 13,350 × 1,460 mm | 13,350 × 1,460 mm | 13,350 × 1,460 mm |
| Row spacing between tables (no shade on 21 December) | 5,350 mm at noon · 6,020 mm ±2 h | 5,930 mm at noon · 6,850 mm ±2 h | 6,500 mm at noon · 7,720 mm ±2 h |
| Steel | 233.7 kg | 262.6 kg | 295.5 kg |
| Bolts | M10 — 74, M8 — 22 | M10 — 82, M8 — 22 | M10 — 90, M8 — 22 |
| Panel clamps | end 4, middle 18 | end 4, middle 18 | end 4, middle 18 |
| Materials | 32,153 UAH | 37,402 UAH | 41,344 UAH |
| With installation and delivery | 51,583 UAH | 56,827 UAH | 60,764 UAH |
| Per 1 kW | 7,164 UAH/kW | 7,893 UAH/kW | 8,439 UAH/kW |
| Yield | 1,266 kWh/kW · 9,118 kWh/year | 1,139 kWh/kW · 8,199 kWh/year | 1,043 kWh/kW · 7,511 kWh/year |
| Strength σ/fy | 98% | 97% | 78% |
| Deflection / (L/200) | 98% | 81% | 56% |
| Rafter strength | 11% | 13% | 12% |
| Post utilisation | 7% | 8% | 8% |
| Utilisation | 93% | 56% | 40% |
| Depth vs frost depth | ok | ok | ok |
| Checks overall | with a caution | with a caution | passes |
Checks and cautions
Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.
- Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 2 520 mm, 6 frames. Purlin C-channel 60×40×2: strength 98%, deflection 98% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 2 120 mm, 7 frames. Purlin C-channel 60×40×2: strength 97%, deflection 81% of L/200 (snow on panel 977 Pa).
- Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø300 × 900: 0.064 m³ of concrete per post. Wind uplift on the front post ≈ 7.2 kN (with γ=1.5) vs ≈ 7.7 kN (concrete weight + soil friction, estimate) → 93%.
Bill of materials
The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 2,022 | 7 |
| П2 | Rear post | Tube 60×60×2 | 2,464 | 7 |
| Кр1 | Rafter (inclined beam) | Tube 60×60×2 | 1,524 | 7 |
| Пк1 | Frame strut | C-channel 60×40×2 | 999 | 7 |
| Х1 | Longitudinal brace (cross) | C-channel 60×40×2 | 2,264 | 4 |
| Р1 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 1 |
| Р2 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 1 |
| Р3 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 1 |
| Р4 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 1 |
| Р5 | Purlin (rail) | C-channel 60×40×2 | 1,350 | 1 |
| Р6 | Purlin (rail) | C-channel 60×40×2 | 1,350 | 1 |
| — | Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors | — | — | 67 |
| — | Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts | — | — | 15 |
| — | End clamp 33 mm | — | — | 4 |
| — | Mid clamp (30–40 mm) | — | — | 18 |
| — | Bolt M8×50 + channel nut | — | — | 22 |
| — | Concrete for 14 posts, Ø300×1100 | — | — | 1.20 m³ |
Profile cutting
17 bars of 6,000 mm, 84.8 m of profile in total.
- Tube 60×60×29 bars
- C-channel 60×40×28 bars
Estimated cost
The engine's materials estimate for the median zone (Cherkasy).
- Materials
- 37,402₴
- With installation and delivery
- 56,827₴
- Per 1 kW
- 7,893UAH/kW
Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
All 20 lines of the engine's estimate, with prices
| Item | Quantity | Price, UAH | Sum, UAH |
|---|---|---|---|
| Tube 60×60×2, stock length 6 000 mm | 9 bar | 210 | 11,340 |
| C-channel 60×40×2, stock length 6 000 mm | 8 bar | 230 | 11,040 |
| C-channel connector (splice plate L 300) | 4 pcs | 90 | 360 |
| Bolt M10×140 cl. 8.8 set — frame, struts | 44 pcs | 22 | 968 |
| Bolt M10×80 cl. 8.8 set — purlins, braces, connectors | 32 pcs | 22 | 704 |
| Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts | 15 pcs | 27 | 405 |
| End clamp 33 mm | 4 pcs | 35 | 140 |
| Mid clamp (30–40 mm) | 18 pcs | 32 | 576 |
| Bolt M8×50 A2 + spring channel nut M8 | 25 pcs | 14 | 350 |
| Post base anchor pin (M10 / rebar Ø12) | 14 pcs | 20 | 280 |
| Borehole casing (roofing felt / PVC, 300 mm) | 14 pcs | 60 | 840 |
| Crushed stone 20–40 for the bottom of the boreholes | 0.10 m³ | 900 | 90 |
| Earth electrode: 2 rods Ø16×1.5 m + strip 40×4 | 1 set | 1,500 | 1,500 |
| Wire PV-3 6 mm² green-yellow | 33 m | 35 | 1,155 |
| Module earthing clip (under the clamp) | 10 pcs | 20 | 200 |
| Cable clip, stainless | 30 pcs | 5 | 150 |
| Zinc paint / cold galvanising spray 400 ml | 2 pcs | 350 | 700 |
| Concrete M200 for posts | 1.20 m³ | 3,800 | 4,560 |
| Rebar Ø10 (4 bars per post) | 73 m | 28 | 2,044 |
| Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 7 × 70 mm, 4 × 30 mm, 7 × 10 mm | 22 pcs | 0 | 0 |
| Materials | 37,402 | ||
Yield
Yield: 1,139 kWh per 1 kW a year, ≈ 8,199 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).
A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.