84 Ulica UL-620M-132DDGN (dual glass bifacial) panels (52.08 kW) on 3 tables of 2 × 14. Snow and wind per the DBN for Ivano-Frankivsk: S₀ 1,410 Pa, W₀ 500 Pa.
- Power
- 52.08kW
- Steel
- 1,824.7kg
- Posts
- 72
- Bolts
- 666
- Materials
- 238,254₴
- Yield
- 60,495kWh/year
Ground frame designer
Design the 50 kW plant in the builder
Opens the 2 × 14 table with the Ulica UL-620M-132DDGN (dual glass bifacial) panel and the loads for Ivano-Frankivsk.
- No sign-up
- Snow and wind check
- Drawings and estimate
Panel
Ulica UL-620M-132DDGN (dual glass bifacial): 620 W, 2,382 × 1,134 mm, portrait.
One table's structure (tables: 3)
| Layout | 3 tables, each 2 × 14 = 28 panels |
|---|---|
| Loads (DBN V.1.2-2:2006) | snow S₀ 1,410 Pa, wind W₀ 500 Pa, frost depth 0.7 m |
| Posts | Tube 60×60×2 |
| Rafters | C-channel 60×40×2 |
| Purlins and braces | C-channel 60×40×2 |
| Frames | 12 frames, pitch up to 1,440 mm |
| Posts | 24 |
| Footings (bored concrete) | 24 pcs, Ø350 mm, depth 1,000 mm |
| Concrete | 2.54 m³ |
| Tilt | 30° |
| Panel bottom / post top | 600 / 2,287 mm |
| Panel field size | 16,276 × 3,102 mm |
| Row spacing between tables (no shade on 21 December) | 11,660 mm at noon · 13,390 mm ±2 h |
| Steel | 608.2 kg |
| Bolts | M10 — 162, M8 — 60 |
| Panel clamps | end 8, middle 52 |
| Materials | 79,418 UAH |
| With installation and delivery | 123,615 UAH |
| Per 1 kW | 7,121 UAH/kW |
| Yield | 1,162 kWh/kW · 20,165 kWh/year |
Checks and cautions
| Check | Value | Status |
|---|---|---|
| Strength σ/fy | 47% | passes |
| Deflection / (L/200) | 27% | passes |
| Rafter strength | 94% | with a caution |
| Post utilisation | 18% | passes |
| Utilisation | 96% | with a caution |
| Depth vs frost depth | ok | passes |
- Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 94%.
- Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Foundation Ø350 × 1 000: 0.096 m³ of concrete per post. Wind uplift on the front post ≈ 9.9 kN (with γ=1.5) vs ≈ 10.3 kN (concrete weight + soil friction, estimate) → 96%.
Bill of materials
The bill of materials and the estimate are per table; tables: 3.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 2,174 | 12 |
| П2 | Rear post | Tube 60×60×2 | 3,312 | 12 |
| Кр1 | Rafter (inclined beam) | C-channel 60×40×2 | 3,924 | 12 |
| Пк1 | Frame strut | C-channel 60×40×2 | 1,818 | 12 |
| Х1 | Longitudinal brace (cross) | C-channel 60×40×2 | 2,193 | 4 |
| Р1 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р2 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р3 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р4 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р5 | Purlin (rail) | C-channel 60×40×2 | 4,276 | 2 |
| Р6 | Purlin (rail) | C-channel 60×40×2 | 4,276 | 2 |
| — | Bolt M10×25 set · purlins, braces, connectors | — | — | 34 |
| — | Bolt M10×80 set · purlin to rafter | — | — | 48 |
| — | Bolt M10×90 set · strut to post — through spacer inserts | — | — | 12 |
| — | Bolt M10×130 set · post–rafter — through spacer inserts | — | — | 48 |
| — | Bolt M10×140 set · strut to rafter — through spacer inserts | — | — | 12 |
| — | Bolt M10×150 set · brace to post — through spacer inserts | — | — | 8 |
| — | End clamp 30 mm | — | — | 8 |
| — | Mid clamp (30–40 mm) | — | — | 52 |
| — | Bolt M8×50 + channel nut | — | — | 60 |
| — | Concrete for 24 posts, Ø350×1000 | — | — | 2.54 m³ |
Profile cutting
38 bars of 6,000 mm, 208.6 m of profile in total.
- Tube 60×60×212 bars
- C-channel 60×40×226 bars
Estimated cost
The bill of materials and the estimate are per table; tables: 3.
- Materials per table
- 79,418₴
- With installation and delivery
- 123,615₴
- Per 1 kW
- 7,121UAH/kW
The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
Materials for all tables (3): 238,254 UAH.
Yield
Yield: 1,162 kWh per 1 kW a year, ≈ 60,495 kWh a year in total for Ivano-Frankivsk (tilt 30°, the optimum for the latitude is 35.1°).