Ground plant · Ivano-Frankivsk
A 30 kW ground-mounted solar plant in Ivano-Frankivsk: structure, materials, cost
52 Ulica UL-620M-132DDGN (dual glass bifacial) panels (32.24 kW) on 2 tables of 2 × 13. Snow and wind per the DBN for Ivano-Frankivsk: S₀ 1,410 Pa, W₀ 500 Pa.
- Power
- 32.24kW
- Steel
- 1,123.5kg
- Posts
- 44
- Bolts
- 416
- Materials
- 144,212₴
- Yield
- 37,450kWh/year
Ground frame designer
Design the 30 kW plant in the builder
Opens the 2 × 13 table with the Ulica UL-620M-132DDGN (dual glass bifacial) panel and the loads for Ivano-Frankivsk.
- No sign-up
- Snow and wind check
- Drawings and estimate
Panel
Ulica UL-620M-132DDGN (dual glass bifacial): 620 W, 2,382 × 1,134 mm, portrait.
One table's structure (tables: 2)
| Layout | 2 tables, each 2 × 13 = 26 panels |
|---|---|
| Loads (DBN V.1.2-2:2006) | snow S₀ 1,410 Pa, wind W₀ 500 Pa, frost depth 0.7 m |
| Posts | Tube 60×60×2 |
| Rafters | C-channel 60×40×2 |
| Purlins and braces | C-channel 60×40×2 |
| Frames | 11 frames, pitch up to 1,470 mm |
| Posts | 22 |
| Footings (bored concrete) | 22 pcs, Ø350 mm, depth 1,000 mm |
| Concrete | 2.33 m³ |
| Tilt | 30° |
| Panel bottom / post top | 600 / 2,287 mm |
| Panel field size | 15,122 × 3,102 mm |
| Row spacing between tables (no shade on 21 December) | 11,660 mm at noon · 13,390 mm ±2 h |
| Steel | 561.8 kg |
| Bolts | M10 — 152, M8 — 56 |
| Panel clamps | end 8, middle 48 |
| Materials | 72,106 UAH |
| With installation and delivery | 113,236 UAH |
| Per 1 kW | 7,025 UAH/kW |
| Yield | 1,162 kWh/kW · 18,725 kWh/year |
Checks and cautions
| Check | Value | Status |
|---|---|---|
| Strength σ/fy | 49% | passes |
| Deflection / (L/200) | 28% | passes |
| Rafter strength | 96% | with a caution |
| Post utilisation | 19% | passes |
| Utilisation | 98% | with a caution |
| Depth vs frost depth | ok | passes |
- Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 96%.
- Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Foundation Ø350 × 1 000: 0.096 m³ of concrete per post. Wind uplift on the front post ≈ 10.1 kN (with γ=1.5) vs ≈ 10.3 kN (concrete weight + soil friction, estimate) → 98%.
Bill of materials
The bill of materials and the estimate are per table; tables: 2.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 2,174 | 11 |
| П2 | Rear post | Tube 60×60×2 | 3,312 | 11 |
| Кр1 | Rafter (inclined beam) | C-channel 60×40×2 | 3,924 | 11 |
| Пк1 | Frame strut | C-channel 60×40×2 | 1,818 | 11 |
| Х1 | Longitudinal brace (cross) | C-channel 60×40×2 | 2,213 | 4 |
| Р1 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р2 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р3 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р4 | Purlin (rail) | C-channel 60×40×2 | 6,000 | 2 |
| Р5 | Purlin (rail) | C-channel 60×40×2 | 3,122 | 2 |
| Р6 | Purlin (rail) | C-channel 60×40×2 | 3,122 | 2 |
| — | Bolt M10×25 set · purlins, braces, connectors | — | — | 34 |
| — | Bolt M10×80 set · purlin to rafter | — | — | 44 |
| — | Bolt M10×90 set · strut to post — through spacer inserts | — | — | 11 |
| — | Bolt M10×130 set · post–rafter — through spacer inserts | — | — | 44 |
| — | Bolt M10×140 set · strut to rafter — through spacer inserts | — | — | 11 |
| — | Bolt M10×150 set · brace to post — through spacer inserts | — | — | 8 |
| — | End clamp 30 mm | — | — | 8 |
| — | Mid clamp (30–40 mm) | — | — | 48 |
| — | Bolt M8×50 + channel nut | — | — | 56 |
| — | Concrete for 22 posts, Ø350×1000 | — | — | 2.33 m³ |
Profile cutting
34 bars of 6,000 mm, 192.9 m of profile in total.
- Tube 60×60×211 bars
- C-channel 60×40×223 bars
Estimated cost
The bill of materials and the estimate are per table; tables: 2.
- Materials per table
- 72,106₴
- With installation and delivery
- 113,236₴
- Per 1 kW
- 7,025UAH/kW
The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
Materials for all tables (2): 144,212 UAH.
Yield
Yield: 1,162 kWh per 1 kW a year, ≈ 37,450 kWh a year in total for Ivano-Frankivsk (tilt 30°, the optimum for the latitude is 35.1°).
A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.