Ground-mount post depth below the frost line (Bialystok)

How deep to set the posts of a ground-mount solar array where the ground freezes: frost depth by city, depth in concrete from 800 to 1600 mm, concrete volume and the uplift margin. Numbers from the Solispec engine.

By Solispec editorial3 min read

Posts of a ground-mount array in Bialystok must go at least 1200 mm into the ground, below the frost depth. Of the depths tried, 1300 mm is the first that also holds against uplift: a Ø350 mm concrete post takes 0.125 m³ and works at 52 % of the uplift. At 1000 mm the post stays in the frost zone.

The numbers come from the same engine functions behind the ground table of the Solispec designer. The steel truss of a ballasted frame is checked by the free ground truss calculator, and an overview of the frame is in the article on ground-mount frames.

Starting data

ItemValue
PlaceBialystok, frost depth 1200 mm (guide value of the Polish frost map)
Table2 rows of 5 panels (10 panels, 5.5 kWp), tilt 30°, 8 posts
Foundationconcrete post, Ø350 mm hole
What changesdepth in concrete: 800, 1000, 1300, 1600 mm

Frost depth by city

CityFrost depth
Warszawa1000 mm
Kraków1000 mm
Gdańsk1000 mm
Białystok1200 mm
Wrocław800 mm
Katowice1000 mm

Result by depth in concrete

Depth in concreteBelow the frostConcrete per postUplift per postHoldingUtilisation
800 mmtoo shallow0.077 m³7.04 kN8.26 kN85 %
1000 mmtoo shallow0.096 m³7.04 kN10.32 kN68 %
1300 mmyes0.125 m³7.04 kN13.42 kN52 %
1600 mmyes0.154 m³7.04 kN16.52 kN43 %

Two checks set the depth. The post must stand below the frost so that the ground cannot push it up in winter (frost heave). And the concrete and the friction of the soil along its side must hold the post against wind uplift. The deeper the post, the more concrete and the lower the utilisation.

How to repeat the calculation

  1. Open the Solispec designer and pick the ground table.
  2. Set Bialystok, 2 rows of 5 panels, a tilt of 30° and a hole diameter of 350 mm.
  3. Change the depth in concrete and read the rows "Depth vs frost" and "Utilisation".

The calculation is preliminary. The frost depth is a guide value for the region, not data for your plot. Soil, groundwater and local requirements are checked by the engineer who signs off the foundation. Before installation the calculation must be checked by a qualified engineer, and the installation must be done only by a qualified electrician.

FAQ

How deep should the posts of a ground-mount solar array be?

Below the frost depth: in Bialystok that is 1200 mm. Of the depths tried for a table of 10 panels, 1300 mm is the first that passes both frost and uplift.

What happens if the post is shallower than the frost depth?

In winter frozen ground can push the post up (frost heave). The engine marks such a depth as too shallow: 1000 mm in Bialystok.

Does a deeper post hold uplift better?

Yes. The utilisation falls from 85 % at 800 mm to 43 % at 1600 mm, because the concrete volume and the friction surface grow.

StructuresNorms

News and design tips

What’s new in Solispec, changes to the standards and practical tips on designing solar power systems.

What interests you

How we handle your data: privacy policy.

Ground frame designer

Design the ground frame for your solar plant

Solispec picks the profiles and posts, checks the frame against snow and wind to the DBN and prices it down to the last bolt.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate