Solar plant: site data

Solar power plant in Vasylivka, Zhytomyrskyi Raion, Zhytomyr Oblast

Vasylivka: 1,119 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 1.3% above the oblast median (1,104). #129 of 686 in the rayon, #136 of 1700 in the oblast.

Zhytomyr, the rayon centre, is 56 km away. 215 m above sea level. 49 km away: Berdychiv, the nearest bigger centre, 1,108 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Житомир, 56 km. 12.02 m between rows, pitch 15.84 m (latitude 49.9°).

Yield of 1 kWp
1,119kWh/year
Tilt
37°3° east of south
10 kW
11,191kWh/year
Row pitch
15.84m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Vasylivka

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 56 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan53Feb89Mar120Apr136May143Jun144Jul141Aug114Sep86Oct37Nov26Dec

July: 144 kWh/kWp, December: 26 — 5.5 times less.

January: 31 against 34 in the oblast, 8.8% less.

Vasylivka: plants, kWh
kWpA yearJulyDecember
55,596720130
1011,1911,440260
1516,7872,160390

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zhytomyrskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.