Solar power plant in Ushytsia, Korostenskyi Raion, Zhytomyr Oblast

Ushytsia: 1,086 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 1.7% below the oblast median (1,104). #396 of 560 in the rayon, #1487 of 1700 in the oblast.

Korosten, the rayon centre, is 29 km away. 191 m above sea level. 29 km away: Korosten, the nearest bigger centre, 1,105 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 75 km. 13.26 m between rows, pitch 17.03 m (latitude 50.9°).

Yield of 1 kWp
1,086kWh/year
Tilt
38°3° east of south
10 kW
10,858kWh/year
Row pitch
17.03m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Ushytsia

The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 75 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan54Feb89Mar115Apr131May140Jun138Jul134Aug109Sep79Oct34Nov27Dec

June: 140 kWh/kWp, December: 27 — 5.2 times less.

February: 54 against 56 in the oblast, 3.6% less.

Ushytsia: plants, kWh
kWpA yearJuneDecember
55,429700135
1010,8581,400270
1516,2872,100405

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks