Solar plant: site data
Solar power plant in Spirne, Zhytomyrskyi Raion, Zhytomyr Oblast
Spirne: 1,097 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 0.7% below the oblast median (1,104). #630 of 686 in the rayon, #1230 of 1700 in the oblast.
Zhytomyr, the rayon centre, is 63 km away. 171 m above sea level. 52 km away: Bucha, the nearest bigger centre, the same 1,092. Snow and wind from the nearest regional centre in the DBN — Житомир, 64 km. 12.86 m between rows, pitch 16.63 m (latitude 50.5°).
- Yield of 1 kWp
- 1,097kWh/year
- Tilt
- 38°3° east of south
- 10 kW
- 10,967kWh/year
- Row pitch
- 16.63m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,460 / 460Pa
Ground frame designer
A ground frame for a solar plant: Spirne
The designer opens with this place’s coordinates, latitude 50.5° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 64 km: snow 1,460 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 139 kWh/kWp, December: 26 — 5.3 times less.
February: 53 against 56 in the oblast, 5.4% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,484 | 695 | 130 |
| 10 | 10,967 | 1,390 | 260 |
| 15 | 16,451 | 2,085 | 390 |
Example: a 10 kW ground frame
For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.
How these numbers are computed
Nearby
- Taboryshche2 km1,097 kWh/kWp
- Bilka3 km1,086 kWh/kWp
- Komarivka3 km1,092 kWh/kWp
- Raivka3 km1,097 kWh/kWp
- Khomivka6 km1,086 kWh/kWp
- Tovste6 km1,100 kWh/kWp
All places: Zhytomyrskyi RaionZhytomyr Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.