Solar power plant in Severynivka, Zhytomyrskyi Raion, Zhytomyr Oblast

Severynivka: 1,094 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.0% below the oblast median (1,104). #653 of 686 in the rayon, #1331 of 1700 in the oblast.

Zhytomyr, the rayon centre, is 76 km away. 281 m above sea level. 30 km away: Khmilnyk, the nearest bigger centre, 1,116 — 2.0% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 74 km. 11.64 m between rows, pitch 15.51 m (latitude 49.8°).

Yield of 1 kWp
1,094kWh/year
Tilt
36°2° east of south
10 kW
10,939kWh/year
Row pitch
15.51m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Severynivka

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 74 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan48Feb83Mar118Apr135May139Jun142Jul138Aug112Sep84Oct37Nov29Dec

July: 142 kWh/kWp, December: 29 — 4.9 times less.

February: 48 against 56 in the oblast, 14.3% less.

Severynivka: plants, kWh
kWpA yearJulyDecember
55,470710145
1010,9391,420290
1516,4092,130435

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zhytomyrskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.