Solar plant: site data

Solar power plant in Musiivka, Berdychivskyi Raion, Zhytomyr Oblast

Musiivka: 1,115 kWh per kWp a year, tilt 36° 4° east of south (PVGIS). 0.9% above the oblast median (1,104). #37 of 160 in the rayon, #254 of 1700 in the oblast.

Berdychiv, the rayon centre, is 56 km away. 225 m above sea level. 49 km away: Fastiv, the nearest bigger centre, the same 1,119. Snow and wind from the nearest regional centre in the DBN — Житомир, 68 km. 11.65 m between rows, pitch 15.52 m (latitude 49.8°).

Yield of 1 kWp
1,115kWh/year
Tilt
36°4° east of south
10 kW
11,147kWh/year
Row pitch
15.52m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Musiivka

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 68 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

31Jan51Feb89Mar120Apr137May142Jun143Jul140Aug113Sep85Oct37Nov26Dec

July: 143 kWh/kWp, December: 26 — 5.5 times less.

February: 51 against 56 in the oblast, 8.9% less.

Musiivka: plants, kWh
kWpA yearJulyDecember
55,574715130
1011,1471,430260
1516,7212,145390

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berdychivskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.