Makalevychi: 1,084 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 1.9% below the oblast median (1,104). #685 of 686 in the rayon, #1506 of 1700 in the oblast.

Zhytomyr, the rayon centre, is 77 km away. 130 m above sea level. 50 km away: Bucha, the nearest bigger centre, 1,092 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Київ, 75 km. 13.06 m between rows, pitch 16.83 m (latitude 50.7°).

Yield of 1 kWp
1,084kWh/year
Tilt
38°4° east of south
10 kW
10,839kWh/year
Row pitch
16.83m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,550 / 370Pa

Ground frame designer

A ground frame for a solar plant: Makalevychi

The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Київ, 75 km: snow 1,550 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan55Feb93Mar116Apr130May136Jun135Jul133Aug110Sep79Oct34Nov27Dec

June: 136 kWh/kWp, December: 27 — 5.0 times less.

January: 36 against 34 in the oblast, 5.9% more.

Makalevychi: plants, kWh
kWpA yearJuneDecember
55,420680135
1010,8391,360270
1516,2592,040405

Snow and wind: Київ

Example: a 10 kW ground frame

For the loads of Kyiv: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 47,122 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zhytomyrskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.