Solar plant: site data

Solar power plant in Krasivka, Berdychivskyi Raion, Zhytomyr Oblast

Krasivka: 1,115 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.0% above the oblast median (1,104). #34 of 160 in the rayon, #246 of 1700 in the oblast.

Berdychiv, the rayon centre, is 18 km away. 250 m above sea level. 18 km away: Berdychiv, the nearest bigger centre, 1,108 — 0.6% more here. Snow and wind from the nearest regional centre in the DBN — Житомир, 40 km. 12.00 m between rows, pitch 15.82 m (latitude 49.9°).

Yield of 1 kWp
1,115kWh/year
Tilt
37°2° east of south
10 kW
11,149kWh/year
Row pitch
15.82m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Krasivka

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 40 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

29Jan54Feb89Mar120Apr137May142Jun143Jul140Aug113Sep85Oct37Nov27Dec

July: 143 kWh/kWp, December: 27 — 5.3 times less.

January: 29 against 34 in the oblast, 14.7% less.

Krasivka: plants, kWh
kWpA yearJulyDecember
55,575715135
1011,1491,430270
1516,7242,145405

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berdychivskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.