Solar plant: site data
Solar power plant in Karpivtsi, Zhytomyrskyi Raion, Zhytomyr Oblast
Karpivtsi: 1,111 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.6% above the oblast median (1,104). #337 of 686 in the rayon, #480 of 1700 in the oblast.
Zhytomyr, the rayon centre, is 52 km away. 239 m above sea level. 34 km away: Berdychiv, the nearest bigger centre, the same 1,108. Snow and wind from the nearest regional centre in the DBN — Житомир, 50 km. 12.05 m between rows, pitch 15.87 m (latitude 50.0°).
- Yield of 1 kWp
- 1,111kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,106kWh/year
- Row pitch
- 15.87m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,460 / 460Pa
Ground frame designer
A ground frame for a solar plant: Karpivtsi
The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 50 km: snow 1,460 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 142 kWh/kWp, December: 30 — 4.7 times less.
December: 30 against 27 in the oblast, 11.1% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,553 | 710 | 150 |
| 10 | 11,106 | 1,420 | 300 |
| 15 | 16,659 | 2,130 | 450 |
Example: a 10 kW ground frame
For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.
How these numbers are computed
Nearby
- Beizymivka3 km1,113 kWh/kWp
- Volosivka4 km1,111 kWh/kWp
- Shevchenka6 km1,114 kWh/kWp
- Miaskivka6 km1,109 kWh/kWp
- Kilky6 km1,111 kWh/kWp
- Troshcha6 km1,113 kWh/kWp
All places: Zhytomyrskyi RaionZhytomyr Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.