Solar power plant in Husarivka, Korostenskyi Raion, Zhytomyr Oblast

Husarivka: 1,102 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). Exactly the oblast median (1,104). #156 of 560 in the rayon, #984 of 1700 in the oblast.

Korosten, the rayon centre, is 51 km away. 142 m above sea level. 51 km away: Korosten, the nearest bigger centre, the same 1,105. Snow and wind from the nearest regional centre in the DBN — Житомир, 125 km. 13.80 m between rows, pitch 17.57 m (latitude 51.3°).

Yield of 1 kWp
1,102kWh/year
Tilt
38°2° east of south
10 kW
11,016kWh/year
Row pitch
17.57m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Husarivka

The designer opens with this place’s coordinates, latitude 51.3° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 125 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan57Feb94Mar120Apr135May142Jun139Jul134Aug111Sep78Oct34Nov26Dec

June: 142 kWh/kWp, December: 26 — 5.5 times less.

October: 78 against 81 in the oblast, 3.7% less.

Husarivka: plants, kWh
kWpA yearJuneDecember
55,508710130
1011,0161,420260
1516,5242,130390

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed