Solar plant: site data

Solar power plant in Hrynivtsi, Zhytomyrskyi Raion, Zhytomyr Oblast

Hrynivtsi: 1,096 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.8% below the oblast median (1,104). #639 of 686 in the rayon, #1257 of 1700 in the oblast.

Zhytomyr, the rayon centre, is 79 km away. 233 m above sea level. 31 km away: Polonne, the nearest bigger centre, 1,103 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 75 km. 11.70 m between rows, pitch 15.57 m (latitude 49.9°).

Yield of 1 kWp
1,096kWh/year
Tilt
36°2° east of south
10 kW
10,961kWh/year
Row pitch
15.57m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Hrynivtsi

The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 75 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan48Feb83Mar119Apr135May140Jun142Jul139Aug112Sep84Oct37Nov28Dec

July: 142 kWh/kWp, December: 28 — 5.1 times less.

February: 48 against 56 in the oblast, 14.3% less.

Hrynivtsi: plants, kWh
kWpA yearJulyDecember
55,481710140
1010,9611,420280
1516,4422,130420

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zhytomyrskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.