Solar plant: site data

Solar power plant in Horodyshche, Zhytomyrskyi Raion, Zhytomyr Oblast

Horodyshche: 1,124 kWh per kWp a year, tilt 38° 3° east of south (PVGIS). 1.8% above the oblast median (1,104). #37 of 686 in the rayon, #38 of 1700 in the oblast.

Zhytomyr, the rayon centre, is 13 km away. 211 m above sea level. 13 km away: Zhytomyr, the nearest bigger centre, 1,108 — 1.5% more here. Snow and wind from the nearest regional centre in the DBN — Житомир, 15 km. 12.70 m between rows, pitch 16.47 m (latitude 50.3°).

Yield of 1 kWp
1,124kWh/year
Tilt
38°3° east of south
10 kW
11,242kWh/year
Row pitch
16.47m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Horodyshche

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 15 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan58Feb94Mar121Apr136May141Jun141Jul137Aug112Sep84Oct36Nov29Dec

June: 141 kWh/kWp, December: 29 — 4.9 times less.

December: 29 against 27 in the oblast, 7.4% more.

Horodyshche: plants, kWh
kWpA yearJuneDecember
55,621705145
1011,2421,410290
1516,8632,115435

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zhytomyrskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.