Solar power plant in Horodok, Zhytomyrskyi Raion, Zhytomyr Oblast
Horodok: 1,085 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 1.8% below the oblast median (1,104). #682 of 686 in the rayon, #1493 of 1700 in the oblast.
Zhytomyr, the rayon centre, is 66 km away. 246 m above sea level. 53 km away: Bucha, the nearest bigger centre, 1,092 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 68 km. 12.96 m between rows, pitch 16.73 m (latitude 50.6°).
- Yield of 1 kWp
- 1,085kWh/year
- Tilt
- 38°4° east of south
- 10 kW
- 10,848kWh/year
- Row pitch
- 16.73m · GCR 0.29
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,460 / 460Pa
Ground frame designer
A ground frame for a solar plant: Horodok
The designer opens with this place’s coordinates, latitude 50.6° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 68 km: snow 1,460 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 136 kWh/kWp, December: 27 — 5.0 times less.
January: 37 against 34 in the oblast, 8.8% more.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,424 | 680 | 135 |
| 10 | 10,848 | 1,360 | 270 |
| 15 | 16,272 | 2,040 | 405 |
Example: a 10 kW ground frame
For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.
How these numbers are computed
Nearby
- Osiv4 km1,090 kWh/kWp
- Bila Krynytsia5 km1,084 kWh/kWp
- Khomivka5 km1,086 kWh/kWp
- Krymok5 km1,085 kWh/kWp
- Vyshevychi6 km1,106 kWh/kWp
- Mezhyrichka7 km1,096 kWh/kWp
All places: Zhytomyrskyi RaionZhytomyr Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.