Solar plant: site data

Solar power plant in Chervonyi Bir, Zviahelskyi Raion, Zhytomyr Oblast

Chervonyi Bir: 1,092 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.1% below the oblast median (1,104). #212 of 294 in the rayon, #1378 of 1700 in the oblast.

Zvyahel, the rayon centre, is 22 km away. 224 m above sea level. 22 km away: Zvyahel, the nearest bigger centre, 1,101 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 70 km. 13.02 m between rows, pitch 16.79 m (latitude 50.7°).

Yield of 1 kWp
1,092kWh/year
Tilt
38°2° east of south
10 kW
10,920kWh/year
Row pitch
16.79m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Chervonyi Bir

The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 70 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan54Feb90Mar116Apr132May140Jun138Jul134Aug110Sep80Oct35Nov28Dec

June: 140 kWh/kWp, December: 28 — 5.0 times less.

December: 28 against 27 in the oblast, 3.7% more.

Chervonyi Bir: plants, kWh
kWpA yearJuneDecember
55,460700140
1010,9201,400280
1516,3802,100420

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zviahelskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.