Solar plant: site data
Solar power plant in Antopil, Berdychivskyi Raion, Zhytomyr Oblast
Antopil: 1,116 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.1% above the oblast median (1,104). #22 of 160 in the rayon, #209 of 1700 in the oblast.
Berdychiv, the rayon centre, is 29 km away. 228 m above sea level. 25 km away: Zhytomyr, the nearest bigger centre, 1,108 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Житомир, 25 km. 12.15 m between rows, pitch 15.97 m (latitude 50.1°).
- Yield of 1 kWp
- 1,116kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,160kWh/year
- Row pitch
- 15.97m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,460 / 460Pa
Ground frame designer
A ground frame for a solar plant: Antopil
The designer opens with this place’s coordinates, latitude 50.1° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 25 km: snow 1,460 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 143 kWh/kWp, December: 26 — 5.5 times less.
January: 30 against 34 in the oblast, 11.8% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,580 | 715 | 130 |
| 10 | 11,160 | 1,430 | 260 |
| 15 | 16,740 | 2,145 | 390 |
Example: a 10 kW ground frame
For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.
How these numbers are computed
Nearby
- Leonivka3 km1,116 kWh/kWp
- Hlynivtsi5 km1,119 kWh/kWp
- Nova Kotelnia5 km1,118 kWh/kWp
- Velyki Moshkivtsi5 km1,119 kWh/kWp
- Volosiv6 km1,118 kWh/kWp
- Starosillia6 km1,118 kWh/kWp
All places: Berdychivskyi RaionZhytomyr Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.