Solar plant: site data

Solar power plant in Yakymivske, Melitopolskyi Raion, Zaporizhzhia Oblast

Yakymivske: 1,235 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.9% above the oblast median (1,212). #100 of 215 in the rayon, #163 of 972 in the oblast.

Melitopol, the rayon centre, is 45 km away. 32 m above sea level. 23 km away: Yakymivka, the nearest bigger centre, 1,243 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 134 km. 9.34 m between rows, pitch 13.21 m (latitude 46.6°).

Yield of 1 kWp
1,235kWh/year
Tilt
36°1° east of south
10 kW
12,349kWh/year
Row pitch
13.21m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Yakymivske

The designer opens with this place’s coordinates, latitude 46.6° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 134 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

42Jan57Feb104Mar123Apr144May143Jun151Jul154Aug128Sep98Oct56Nov36Dec

August: 154 kWh/kWp, December: 36 — 4.3 times less.

January: 42 against 37 in the oblast, 13.5% more.

Yakymivske: plants, kWh
kWpA yearAugustDecember
56,175770180
1012,3491,540360
1518,5242,310540

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.