Solar plant: site data
Solar power plant in Volodymyrivka, Melitopolskyi Raion, Zaporizhzhia Oblast
Volodymyrivka: 1,253 kWh per kWp a year, tilt 36° facing south (PVGIS). 3.4% above the oblast median (1,212). #52 of 215 in the rayon, #84 of 972 in the oblast.
Melitopol, the rayon centre, is 27 km away. 15 m above sea level. 4 km away: Yakymivka, the nearest bigger centre, 1,243 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 131 km. 9.35 m between rows, pitch 13.22 m (latitude 46.7°).
- Yield of 1 kWp
- 1,253kWh/year
- Tilt
- 36°facing south
- 10 kW
- 12,533kWh/year
- Row pitch
- 13.22m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Volodymyrivka
The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 131 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 154 kWh/kWp, December: 36 — 4.3 times less.
January: 45 against 37 in the oblast, 21.6% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,267 | 770 | 180 |
| 10 | 12,533 | 1,540 | 360 |
| 15 | 18,800 | 2,310 | 540 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Oleksandrivka1 km1,251 kWh/kWp
- Yakymivka4 km1,243 kWh/kWp
- Yur'yivka6 km1,266 kWh/kWp
- Radyvonivka7 km1,252 kWh/kWp
- Peremoha7 km1,252 kWh/kWp
- Fruktove8 km1,251 kWh/kWp
All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.