Solar plant: site data

Solar power plant in Ukrainske, Polohivskyi Raion, Zaporizhzhia Oblast

Ukrainske: 1,207 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,212). #54 of 249 in the rayon, #522 of 972 in the oblast.

Polohy, the rayon centre, is 11 km away. 86 m above sea level. 11 km away: Polohy, the nearest bigger centre, 1,199 — 0.7% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 82 km. 9.88 m between rows, pitch 13.75 m (latitude 47.5°).

Yield of 1 kWp
1,207kWh/year
Tilt
36°2° east of south
10 kW
12,073kWh/year
Row pitch
13.75m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Ukrainske

The designer opens with this place’s coordinates, latitude 47.5° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 82 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan57Feb99Mar120Apr140May142Jun150Jul151Aug126Sep96Oct55Nov32Dec

August: 151 kWh/kWp, December: 32 — 4.7 times less.

January: 40 against 37 in the oblast, 8.1% more.

Ukrainske: plants, kWh
kWpA yearAugustDecember
56,037755160
1012,0731,510320
1518,1102,265480

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Polohivskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.