Solar power plant in Tersianka, Zaporizkyi Raion, Zaporizhzhia Oblast

Tersianka: 1,179 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 2.7% below the oblast median (1,212). #282 of 286 in the rayon, #930 of 972 in the oblast.

Zaporizhzhya, the rayon centre, is 44 km away. 160 m above sea level. 19 km away: Vilnyansk, the nearest bigger centre, 1,191 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 43 km. 10.27 m between rows, pitch 14.14 m (latitude 48.1°).

Yield of 1 kWp
1,179kWh/year
Tilt
36°2° east of south
10 kW
11,786kWh/year
Row pitch
14.14m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Tersianka

The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 43 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan52Feb94Mar117Apr139May144Jun152Jul152Aug124Sep93Oct48Nov28Dec

July: 152 kWh/kWp, December: 28 — 5.4 times less.

December: 28 against 32 in the oblast, 12.5% less.

Tersianka: plants, kWh
kWpA yearJulyDecember
55,893760140
1011,7861,520280
1517,6792,280420

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zaporizkyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.