Solar plant: site data

Solar power plant in Prymorsk, Berdianskyi Raion, Zaporizhzhia Oblast

Prymorsk: 1,283 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 5.9% above the oblast median (1,212). #11 of 116 in the rayon, #16 of 972 in the oblast.

Berdyansk, the rayon centre, is 34 km away. 5 m above sea level. 34 km away: Berdyansk, the nearest bigger centre, 1,294 — 0.8% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 154 km. 9.40 m between rows, pitch 13.27 m (latitude 46.7°).

Yield of 1 kWp
1,283kWh/year
Tilt
36°3° west of south
10 kW
12,834kWh/year
Row pitch
13.27m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Prymorsk

The designer opens with this place’s coordinates, latitude 46.7° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 154 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

44Jan64Feb104Mar130Apr150May152Jun158Jul161Aug132Sep99Oct54Nov37Dec

August: 161 kWh/kWp, December: 37 — 4.4 times less.

January: 44 against 37 in the oblast, 18.9% more.

Prymorsk: plants, kWh
kWpA yearAugustDecember
56,417805185
1012,8341,610370
1519,2512,415555

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berdianskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.