Solar power plant in Prylukivka, Melitopolskyi Raion, Zaporizhzhia Oblast

Prylukivka: 1,228 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). 1.4% above the oblast median (1,212). #133 of 215 in the rayon, #221 of 972 in the oblast.

Melitopol, the rayon centre, is 23 km away. 22 m above sea level. 23 km away: Melitopol, the nearest bigger centre, 1,243 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 92 km. 9.58 m between rows, pitch 13.45 m (latitude 47.0°).

Yield of 1 kWp
1,228kWh/year
Tilt
36°1° east of south
10 kW
12,282kWh/year
Row pitch
13.45m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Prylukivka

The designer opens with this place’s coordinates, latitude 47.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 92 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan58Feb101Mar122Apr143May143Jun152Jul152Aug127Sep97Oct57Nov34Dec

July: 152 kWh/kWp, December: 34 — 4.5 times less.

January: 41 against 37 in the oblast, 10.8% more.

Prylukivka: plants, kWh
kWpA yearJulyDecember
56,141760170
1012,2821,520340
1518,4232,280510

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.