Solar plant: site data
Solar power plant in Pirchyne, Berdianskyi Raion, Zaporizhzhia Oblast
Pirchyne: 1,200 kWh per kWp a year, tilt 36° facing south (PVGIS). 1.0% below the oblast median (1,212). #110 of 116 in the rayon, #607 of 972 in the oblast.
Berdyansk, the rayon centre, is 64 km away. 172 m above sea level. 30 km away: Polohy, the nearest bigger centre, the same 1,199. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 111 km. 9.69 m between rows, pitch 13.56 m (latitude 47.2°).
- Yield of 1 kWp
- 1,200kWh/year
- Tilt
- 36°facing south
- 10 kW
- 12,001kWh/year
- Row pitch
- 13.56m · GCR 0.35
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Pirchyne
The designer opens with this place’s coordinates, latitude 47.2° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 111 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 151 kWh/kWp, December: 31 — 4.9 times less.
December: 31 against 32 in the oblast, 3.1% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,001 | 755 | 155 |
| 10 | 12,001 | 1,510 | 310 |
| 15 | 18,002 | 2,265 | 465 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Verkhnii Tokmak Pershyi2 km1,198 kWh/kWp
- Verkhnii Tokmak Druhyi3 km1,198 kWh/kWp
- Nyzhniy Tokmak3 km1,199 kWh/kWp
- Chernihivka5 km1,205 kWh/kWp
- Novopoltavka6 km1,196 kWh/kWp
- Tokmachansk6 km1,205 kWh/kWp
All places: Berdianskyi RaionZaporizhzhia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.