Solar plant: site data

Solar power plant in Omelnyk, Polohivskyi Raion, Zaporizhzhia Oblast

Omelnyk: 1,201 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 0.9% below the oblast median (1,212). #86 of 249 in the rayon, #598 of 972 in the oblast.

Polohy, the rayon centre, is 33 km away. 58 m above sea level. 11 km away: Orikhiv, the nearest bigger centre, 1,208 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 60 km. 9.97 m between rows, pitch 13.84 m (latitude 47.6°).

Yield of 1 kWp
1,201kWh/year
Tilt
36°2° east of south
10 kW
12,008kWh/year
Row pitch
13.84m · GCR 0.35
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Omelnyk

The designer opens with this place’s coordinates, latitude 47.6° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 60 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan54Feb98Mar120Apr141May143Jun151Jul151Aug125Sep96Oct53Nov31Dec

July: 151 kWh/kWp, December: 31 — 4.9 times less.

February: 54 against 57 in the oblast, 5.3% less.

Omelnyk: plants, kWh
kWpA yearJulyDecember
56,004755155
1012,0081,510310
1518,0122,265465

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Polohivskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.