Solar plant: site data

Solar power plant in Myronivka, Melitopolskyi Raion, Zaporizhzhia Oblast

Myronivka: 1,273 kWh per kWp a year, tilt 36° 2° west of south (PVGIS). 5.0% above the oblast median (1,212). #26 of 215 in the rayon, #47 of 972 in the oblast.

Melitopol, the rayon centre, is 42 km away. 16 m above sea level. 25 km away: Pryazovske, the nearest bigger centre, 1,254 — 1.5% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 153 km. 9.26 m between rows, pitch 13.13 m (latitude 46.5°).

Yield of 1 kWp
1,273kWh/year
Tilt
36°2° west of south
10 kW
12,727kWh/year
Row pitch
13.13m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Myronivka

The designer opens with this place’s coordinates, latitude 46.5° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 153 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

46Jan62Feb102Mar129Apr151May150Jun157Jul159Aug132Sep96Oct51Nov38Dec

August: 159 kWh/kWp, December: 38 — 4.2 times less.

January: 46 against 37 in the oblast, 24.3% more.

Myronivka: plants, kWh
kWpA yearAugustDecember
56,364795190
1012,7271,590380
1519,0912,385570

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.